Location: |
Monaca, PA |
Owner: |
United States Army Corps of Engineers |
Construction Company: |
Fay |
Project Status: |
Construction began in 2020 and is currently ongoing |
Fay was contracted to replace lift gates 9 and 10 at the Montgomery Lock and Dam on the Ohio River in Monaca, PA. After the removal of the original gates, new pedestals were installed, which will raise the machinery beams for operation of the new gates. In addition to replacing this aging infrastructure, modifications will be made on machinery housing, along with the track and sill. The contract also includes the installation of new gate-control and camera systems, which will give dam operators better visibility of the gates and the surrounding areas. This is important because being able to see what's happening around the dam prior to operating the lift gates is vital to the safe operation of the dam. Finally, a new control system will be installed so that the Army Corps of Engineers can operate each lift gate remotely—this is an improvement from the previous system, where the gates were operated manually from the machinery houses.