Location: |
Brookville, PA |
Owner: |
PennDOT |
Construction Company: |
Fay, S&B USA Construction |
Project Status: |
Under construction since 2024 |
Fay, S&B USA Construction's scope of work includes the demolition and reconstruction of the Eastbound (EB) and Westbound (WB) I-80 bridges over North Fork Redbank Creek, Water Plant Road and the Walter Dick Memorial Park. The purpose of this project is to provide a safe and reliable solution that will appropriately accommodate heavy interstate traffic (ADT of 31,000 by 2026, approximately 44% of which is truck traffic) improving connectivity, mobility, loading and geometry. To remedy these issues, North Fork Bridges on I-80 will be replaced and realigned to correct the substandard curve. The dual I-80 bridges over Jenks Street and the Richardsville Road bridges over I-80 will be replaced. This project is part of the larger PennDOT Major Bridges P3 Program (Progressive Design-Build), which consists of five additional bridge locations in the Commonwealth.