Location: |
Perryville and Havre de Grace, MD |
Owner: |
Amtrak |
Construction Company: |
Fay, S&B USA Construction |
Project Status: |
Under construction since February 2024 |
The scope of work for this project includes the demolition of ten remnant piers located on the southeast side of the existing Susquehanna River Bridge. The piers are solid shaft piers that are approximately 20 ft above the waterline and are approximately 24 ft long by 8 ft wide.