Location: |
Pittsburgh, PA |
Owner: |
PennDOT |
Construction Company: |
Fay, S&B USA Construction |
Project Status: |
Project started May 2024 |
For this project, Fay will replace the current open spandrel concrete arch bridge with an arched delta frame structure using sliding accelerated bridge techniques (ABC). The entire new structure will be built south of the existing bridge on temporary foundations while traffic is maintained on the original bridge. Once the new bridge has been completed, the original bridge will be closed down for two to three weeks, and the original structure will be removed using a mixture of conventional and explosive demolition.