In The News

Marine Construction

Fay Razes Monongahela Lock and Dam No. 3

Fay Razes Monongahela Lock and Dam No. 3

This project involves the demolition of existing structures, the establishment of a new navigable channel, and the stabilization of the monoliths that will remain after construction. The economic benefit of creating a new navigable channel is expected to be $200 million annually.

Read more

Joseph B. Fay wins $30M Monongahela River locks, dam contract

Joseph B. Fay wins $30M Monongahela River locks, dam contract

We've been awarded a $30 million contract by the U.S. Army Corps of Engineers to remove the historic Monongahela River Locks and Dam 3 in Elizabeth. This project is a crucial part of the Lower Monongahela River reconstruction, creating 30 miles of unimpeded navigable waterways.

Read more

All Hands On Deck for Fort Eustis Bridge Job

All Hands On Deck for Fort Eustis Bridge Job

The Virginia Department of Transportation (VDOT) is heading up a bridge replacement in a sensitive and highly trafficked area of Newport News, VA.

Read more