This project is constructing a 30-mile long flood diversion channel that is designed to protect Moorhead, Fargo and West Fargo from flooding for 100 years.
S&B USA is part of Bridging Pennsylvania Developers (BPD), a group that formed as a response to the PennDOT Pathways Program, which is rapidly addressing the state's growing backlog of rehabilitation needs for major bridges that are approaching the end of their lifespan.
Fay, S&B USA Construction's scope of work includes the demolition and reconstruction of the Eastbound (EB) and Westbound (WB) I-80 bridges over North Fork Redbank Creek, Water Plant Road and the Walter Dick Memorial Park.
Fay, S&B USA Construction was contracted by Bridging Pennsylvania Constructors (BPC), the design-build construction entity as a prime contractor to perform demolition and replacement of two I-81 spans over the Susquehanna River.
This project constructed four toll lanes on SH 288 in Houston, TX to address congestion and improve the functionality of these interchanges to make travel more direct and accessible.